Welcome to my place to mutter about building my RGS layout, and other thoughts on my site about the Rio Grande Southern railroad.
Sep 26, 2005
Work continues, a little slow this month; focus is the grading below Durango. The grades from the junction near Mancos are complete, and grading under Durango is mostly done up to Hesperus.
Sep 12, 2005
I built the subroadbed under Ridgway, twisting from the edge of the benchwork (for easier access) back to the hole for sneaking thru the closet / bathroom / laundry area. You can also see the hole for the staging access from the yard level (above this hidden track).
Here's the framing for the roundhouse area in Durango; Mancos will be below and in front of this area.