I'm still slowly working thru the wiring of various panels, LEDs, and all the inter-connections to the detectors. Having a detector board in one town, but wiring LEDs and sometimes force-red circuits in other towns, requires a bunch of wiring between the towns, and that just takes time.
I did take a break over Labor Day weekend (which was really beautiful here in the midwest) to gather up a pile of unbuilt kits and get them sprayed w/ base coats and a little weathering - just so I can work on lettering and finishing them over the winter, if I want. With no spray booth, it occurred to me that if I wanted to finish up these rolling stock kits in the winter, I'd better get the spraying part of the work done now! Which I did.
So - back to wiring during my layout work times.