This is a quicky update - I probably eventually post more details on each of these topics. But briefly, besides the trackwork, there's outbuildings, and the beginnings of the Vance Jct location on the layout.
Jun 7, 2015
Some progress on yards turntable
I haven't had time to update this lately, but I have slowly been making progress. Here's some photos of recent work on the first of two planned turntables, and more trackwork in both Ridgway and Durango.
This is a quicky update - I probably eventually post more details on each of these topics. But briefly, besides the trackwork, there's outbuildings, and the beginnings of the Vance Jct location on the layout.
This is a quicky update - I probably eventually post more details on each of these topics. But briefly, besides the trackwork, there's outbuildings, and the beginnings of the Vance Jct location on the layout.
Subscribe to:
Posts (Atom)