Of course, I have a page of notes for tweaks, upgrades, etc - but that's exactly what I was hoping.
Overall, the layout ran well, people seemed to enjoy both the layout and the relaxed narrow-gauge flavored operating scheme.
Here's some of the work at Ridgway, including a small addressing-goof :-)
And there was lots of work on the Enterprise switchbacks, and at Rico:
Telluride also stayed pretty busy:
Here's a train descending the low-line below Ophir:
And the Durango / Hesperus area looked like this: