May 31, 2005
Some decent progress this weekend; I figured out the easement issues and created a couple of reversible plywood templates to use in laying out curves - easements included, each 1/8 of a circle. By flipping and / or combining these, I can trace any curve I need in a 30" radius (my minimum). I laid out the curves on either side of Lizard Head, and completed grades and subroadbed for the McPhee staging and most of the Lizard Hd main above it. Here's a shot, w/the Lizard Head grade above, dropping toward the Ophir loop area.