Wow... has it really been a month and a half since that last post?
Anyway, I've managed to get another 4 Tortoise installs done, along w/ the related control-panel wiring. The turnouts for both ends of the Ophir siding are done now, as is the hidden crossover in the bathroom closet, just outside of Ridgway's yard. That was difficult; I will (promise!) post photos soon of that one.
Next up is trying to find a way to install Tortoises on the 3-way at the start of Ridgway's yard, which is a difficult reach from the aisle. Another Tortoise is about finished on the first turnout of the Ridgway yard ladder - that one also being in the closet.