Dec 27, 2005
Dec 5, 2005
It's been busy around our house lately, so again not much progress. The lower return loop under Ophir is done now (sub-roadbed only), and joists are added from Ophir to Vance Jct. I've also been working on the upper deck for Rico, which is now complete (but not anchored until the track below is installed and tested). And, I've also been installing fabric skirting with clothespin anchors (glued to the benchwork) and landscape fabric - an idea mentioned by David Zuhn and published in Oct 05 Model Railroader (I think it was the Oct issue). The fabric I used was 4' x 80', cost about $9 at Home Depot, and came in a cellophane-wrapped roll. It's black, somewhat feathery in appearance and about 90% opaque, and melts rather than burns if tested w/flames. It works great, and is fast and cheap, and really dresses up the area by hiding all the junk under the layout.
Oct 31, 2005
Pretty good progress this past couple of weeks - the grade for the switch lead out of Durango is done to a point above Wildcat Canyon, and the hidden grade diretly under it is done to that point as well. Work is progressing on the townsite for Hesperus and the curvy roadbed in Wildcat Canyon. This has been a slow area to get thru, because I've been building lots of 1x2 u-shaped supports, to hold the switch lead above while making a bit of a tunnel for the hidden track below. The benchwork is quite narrow at this point, and there's not much room for the upper track supports.
Oct 10, 2005
Subscribe to:
Posts (Atom)