May 31, 2005
May 23, 2005
May 2, 2005
The weekend ended up being very busy, so not much done on the layout. With basic framing done for everything except Telluride (and that'll wait until, since I need the space to cut plywood), I thought I'd start on joists and sub-roadbed support. I got a little of that done in the Lizard Head corner, adding some support for the holes coming thru from the laundry room, and starting to think about the complex 3-level trackage in that area. No photos this time. The crazy link behind the furnance is going to wait until I get more experience with the simpler roadbed. Another milestone... actual track-layout supplies are in the basement! I had to spend some time at Mom's this weekend, and while there I dug around the old layout and found a couple cases of cork I'd forgotten about, and a few lengths of leftover code 100 flex, and other tracklaying supplies, and brought all those home.
Apr 25, 2005
And a closeup from the laundry room into the bathroom.
Getting the line behind the water-heater and the furnance is going to be quite a trick... I'm still not sure how to do it. That section will need tracks on two levels, and slight curves in the most inaccesible spots (see the track plan). Luckily my kids are still small enough to fit back there - just gotta teach them some additional construction skills. Perhaps I can build the unit as a couple a bridges, and just slide them in there.
Subscribe to:
Posts (Atom)