Apr 6, 2009

Power supplies

I got a bit more work on the layout done this weekend - still wiring up power supplies for electronics and switch motors. I ended up getting three 3A DC supplies. Two will be wired to together to give me a +12v / com / -12v set for Tortise motors. The third will be used for detector power and other electronics needs. All three are identical 12v DC regulated supplies.

I'm also using an old Racal modem / computer power supply, which has a 1A supply of 5v DC, mostly for lighting LEDs around the layout.

I've run all four supplies thru 1A or 3A circuit breakers (from Tyco Electronics), w/ monitor LEDs in the fasica. This way, I can tell at a glance if they're all running, and I feel a little better having circuit breaker protection. They probably have internal protection as well, but... oh well.

Mar 9, 2009

Fascia paint, and paper updates

If you've been following the updated pages on my RGS site, you may have noticed that the RGS Paper page has been vastly updated - thanks to Ted Klaveren and his son's scanning abilities, that page now sports a large assortment of paperwork from the RGS.

At home, I found time to prime and get the first couple of coats of paint on the fascia. I'm using a Behr semi-gloss in 'Windsor Moor', which is a dark green. I haven't done a lot of house painting, and I've especially not used semi-gloss much. The primer went on easily, but the first and second coat of the main color were more work, and even w/ the second coat it's not completely covering. I'll try to get a third coat on this week. Also, why hasn't anyone invented disposable rollers yet? Man, I hate trying to clean those buggers!

Mar 2, 2009

Fascia sanding, more wiring

After spending some time working on replacing wheelsets and selling off some unneeded parts on eBay, I've moved back into the basement and have been prepping the fascia for painting - at last. Because it's very smooth-surfaced masonite, I gave all of it a light sanding, so the primer will have be able to adhere properly.

I've also been continuing to work on wiring, and now have all of the Ridgway yard wired (and have gained some skills in upside-down soldering!).

Once the fascia is painted, I'll post some new pictures. I know it's been a while, but wiring just isn't very photogenic, and that's all I've been doing lately.

Feb 8, 2009

The fascia is done !!!

A great day yesterday - the garage was warm enough for some wood working, and with most of the existing track wiring complete now, I was able to finish off the last bit of fascia. Time to paint it!

Jan 8, 2009

Wiring wiring wiring...

Wow - I guess it's been a while since I updated this blog, eh?

What time I've had for trains has been spent in the basement, crawling around under the layout, running wiring. Lots and lots of wiring... not the most exciting work in the world, but it's needed infrastructure for everything else.

Lots of soldering - there's been a pile of feeders to drop from all the added track. Then, running block wiring for from all of the new track that I laid in the fall - the Ridgway yard, all of Telluride, a number of spurs, and all of the passing sidings. I've also been working on 5v and 12v power supply busses, for block detection and turnout-motor power.

Telluride, Vance Jct, Rico, Hesperus, Dolores, and Ophir have their wiring complete, at for the track that exists in each (Rico and Dolores have a bunch of track to add yet - the others are done). The large yard at Ridgway is still looming.