Oct 20, 2012
Rock work
See the pictures here - I have been working on a rock wall near Durango's yard lead; basically practicing before moving to the river canyon.
Sep 22, 2012
Canyon plastering !!!
Well - lots of progress on the canyon. These next few shots show the completed cardboard web. Although that ridge looks really narrow, sightlines will keep that nearly hidden when finished (I hope).

This is looking across bridge 42-A, into the river canyon. The section in front I left incomplete, because the canyon is so steep & narrow, I'll need to install and paint the rockwork on the far wall, before building the near-side wall.
Another view looking across bridge 42-A and into the cut.
A less interesting shot, I suppose, but this the trackwork leaving Telluride, and running alongside the river, before diving into the canyon proper. And you can see, the goal of blocking the full view of this little branch is working, and the trackwork here seems far longer than the few feet it really is.

Here's a view holding the camera high, and looking over the ridge, down into the bridge 42-A area
This is the area leading into the cut, with trestle 42-A just before the cut. The shot afterwards shows the cut from the other side.
And with basic plaster cloth completed - here's how it looks right now. Next step - rocks!
This is looking across bridge 42-A, into the river canyon. The section in front I left incomplete, because the canyon is so steep & narrow, I'll need to install and paint the rockwork on the far wall, before building the near-side wall.
Another view looking across bridge 42-A and into the cut.
A less interesting shot, I suppose, but this the trackwork leaving Telluride, and running alongside the river, before diving into the canyon proper. And you can see, the goal of blocking the full view of this little branch is working, and the trackwork here seems far longer than the few feet it really is.
And here's the cut from the far side. The cardboard web shows badly in parts here - but that'll be addressed and hidden later w/ plaster and rockwork. Another goal here was keeping the area on the left side - which is really the aisle serving Dolores (off to the left) - interesting as well. Although the view from this side blocks the entire river canyon, I didn't want a simple wall or hillside - nature is rarely like that, I feel, so I made this an area of little sub-canyons. Should be fun to fill in w/ more rockwork, trees, etc.
Here's a view holding the camera high, and looking over the ridge, down into the bridge 42-A area
Sep 14, 2012
Canyon work progressing
No pictures this time... but I'm continuing with the cardboard web in the Keystone Hill canyon area. It's surprising to me how much is actually needed, to get the shapes just right.
I should mention that my benchwork is built in sections of 8' long or so, and then bolted together. I'm avoiding any structural components from crossing those gaps - thus fascia, roadbed, and now cardboard all have defined edges and support at these section gaps. Roadbed & rail does cross these gaps, and plaster will as well - but my thinking is that I ever have to move this, I can cut those without having to break the main structural parts.
Anyway... this has been a fun study in prototype modeling - the prototype here being the landforms themselves. I've not studied cuts and cliffs in such detail before, and the more I study the photos of the RGS in books, the more I have to come back to the canyon and make it more extreme than I'd dared before - higher cliffs, steeper cuts (nearly vertical), etc.
I should mention that my benchwork is built in sections of 8' long or so, and then bolted together. I'm avoiding any structural components from crossing those gaps - thus fascia, roadbed, and now cardboard all have defined edges and support at these section gaps. Roadbed & rail does cross these gaps, and plaster will as well - but my thinking is that I ever have to move this, I can cut those without having to break the main structural parts.
Anyway... this has been a fun study in prototype modeling - the prototype here being the landforms themselves. I've not studied cuts and cliffs in such detail before, and the more I study the photos of the RGS in books, the more I have to come back to the canyon and make it more extreme than I'd dared before - higher cliffs, steeper cuts (nearly vertical), etc.
Sep 3, 2012
Most ballasting, and roughing in a canyon
This is another take on ballasting - finer ballast in the center,
rockier stuff outside a little. Per typical narrow-gauge, the center
area does have ballast on top of the ties (actually done to encourage
water to run to the outside, when ballasting with dirt or other
materials). Notice the two tie colors... after review by other
authorities in the house, the tan color will be used for most of the
trackwork going forward.
![]() |
| So here's a close-up of some actual trackwork. |
My process:
|
![]() |
| The river exits under RGS Bridge 42-A. |
Above, this shows the river exiting under RGS Bridge 42-A. There really was a river on
Keystone hill, running out under 42-A, but obviously the topography was
different. I'm after interesting visuals here, not an exact duplication
of the prototype hillside, which would be less interesting in this
greatly compressed space. The river, from this view, will twist right
and out of view behind rock walls (not yet roughed in behind the
bridge).
![]() |
| So here's a view looking down the track, thru part of the canyon. |
![]() |
Above is the same section of track, but from the other side. Here, the
river's on the left beyond the cut, and bridge 42-A is at the very top
of the track that's visible here. I'm sticking some of the cardboard
very roughly here - just trying to visualize the overall sight lines and
view blocks. I'm using drywall shims, btw - what you see here is less
than two 50-piece packages - about $8 or so at Menards. And a LOT
easier than cutting all this cardboard! It's really strong too.
![]() |
| One last shot - river on the right again |
One last shot - river on the right again. You can see how the river is descending in a canyon that's getting deeper, with rock walls getting very steep. The hillside along the track is also gradually getting steeper, building to the cut beyond the bridge (just visible as the track curves out of sight to the right in this shot). And again, although this is only about 10' of track, the curves and view blocks will - hopefully - make it seem much longer.
Aug 29, 2012
Ballast experiments !
Trying several types of ballast; which looks best for old, poorly maintained RGS track?
So, first I painted the ties... using (of all things) a Martha Stewart craft paint called Multi-Surface Satin Acrylic Paint. It dries nearly flat, and adheres well (read that as slightly better) to plastic than other acrylics. I'm brush-painting, to avoid fumes in the basement, and this is the best option I've found.
There are some good colors available - I purchased a light tan (used below), a light gray, and a very light gray, almost off-white (which I plan on using to highlight specific ties).
I then painted the rails (hard to see here); I like them dark, so I used the Floquil paint markers, using Floquil Paint Markers. The Rail Tie Brown seemed to work best; the Rail Brown was too light for my tastes.
So that brings us to the ballast options. This is experimentation here - nothing's weathered or anywhere near final.
This first one used some grout coloring in a charcoal color - which is a very fine material.
The second was finely-sifted rock material, colored a little w/ brown sanded grout.
The third was less-sifted rock material, mostly gray.
And the fourth was back to the finely-sifted rock, but without any brown added.
So, first I painted the ties... using (of all things) a Martha Stewart craft paint called Multi-Surface Satin Acrylic Paint. It dries nearly flat, and adheres well (read that as slightly better) to plastic than other acrylics. I'm brush-painting, to avoid fumes in the basement, and this is the best option I've found.
There are some good colors available - I purchased a light tan (used below), a light gray, and a very light gray, almost off-white (which I plan on using to highlight specific ties).
I then painted the rails (hard to see here); I like them dark, so I used the Floquil paint markers, using Floquil Paint Markers. The Rail Tie Brown seemed to work best; the Rail Brown was too light for my tastes.
So that brings us to the ballast options. This is experimentation here - nothing's weathered or anywhere near final.
This first one used some grout coloring in a charcoal color - which is a very fine material.
The second was finely-sifted rock material, colored a little w/ brown sanded grout.
The third was less-sifted rock material, mostly gray.
And the fourth was back to the finely-sifted rock, but without any brown added.
Subscribe to:
Posts (Atom)
















