May 19, 2019

Ridgway Depot - construction begins

 Ridgway Depot started:

After being kinda intimidated by this wonderful but complex kit, I finally dove in and began working on the Ridgway depot kit.  This was offered by Raggs to Riches, and is now out-of-production.

 So, here's the workbench, and the beginning of the work. 


Here's my work bench.  There's a LOT of windows and trim in this kit, all wonderfully lasercut.  For the brown, I decided to spray a base coat on all of it, then add a final brush coat to get the color closer.  I'm using a fairly warm brown, Vallejo Flat Earth for this color.
 

The base is three pieces, with another piece for the floor.  Weights are - of course - actual RGS spikes!

The framing for this kit goes together very nicely - an inner layer which interlocks, and then outer detail layers applied to it.


I wanted to add interior lighting, which means I needed at least some basic interior detail.  And because the first floor section has a 2nd floor going in, I had to work on that detail now.  Some printed pictures from the internet, scaled to about 1.5" high, and some flooring images, did the trick.  A couple figues complete everything I think this needs:






And finally, let's see how this looks with the lighting turned on...



Layout improvements - Flooring and phones

It's been a long time since updates, so I'll toss in a few items.  Spring(ish) since here in the Midwest we just finished up 5" of snow last weekend, in mid-April!  And now it's raining.  Like, almost every day.  Sigh...

 

Flooring:

Anyway, a number of updates to the layout  Over the holidays I added rubber floor tiles, which make working and standing a lot more comfy.  Extra bonus is the floor is warmer in the winter time. The tiles I purchased are these;
and I got a dark brown color.

A small tip - I found static electrictity a minor issue during the winter after putting the floor in; that was solved by advice from a friend... get some liquid fabric softener which has anti-static included, thin it down 2-1 with water, and just spray the floor.  Problem solved!

Phones:

And, to make communication better I added a small phone system.  It took a bit of research, but - again with help and advice from other operators in this area - I found this PABX system, and added a few simple one-line phones.

This had made a huge different, primarily in helping operators coming into and leaving Ridgway, since Vance Junction (next town on the line) is on the opposite side of the basement with a couple small rooms in between.

Here's the control unit (wiring here isn't quite finished...). It just needs power (supplied with the unit), and then I ran a couple CAT5 lines from here to the various phones.  You could use any twisted-pair wiring; it's not critical since this is just basic audio signal (no high-speed networking or anything).



If you're looking for how to determine phone wiring, and the colors to use, here's a couple great pages that helped me:
 There's some simple programming involved, which let me give each of my 5 phones a one-digit number, so calling between phones is really simple. I even ran a connection into the home landline phone, so I can either pick up or dial out using the regular phone as well (by adding a prefix).

Then it was time to actually install all the phones.  I located one in the laundry room, which might someday serve as a dispatcher desk.  Then, one at Ridgway, Vance Jct, Dolores and Durango.

Dispatcher phone:

 Dolores phone:

Durango yard phone (works for Rico as well):

Vance Jct phone:

As you can see, I also labeled the phones with the other extension numbers, and how to pick up / dial out on the house phone if needed.  In the above photo, the label you're seeing was printed on sticky shipping labels, but they didn't adhere well.

After a little more research, I replaced them with some custom-printed vinyl labels, which worked great.  I had no idea it was so easy to have these created -pre-cut to the size I wanted, and printed with any text or image I liked.  I used this place for that; very low cost too!

Here are links to the phone system, and the phones -

Jan 27, 2019

Great, reflective short film about the Cumbres & Toltec

Check it out.  And, there's a little RGS in Telluride.

https://video.nationalgeographic.com/video/short-film-showcase/00000168-80f8-df6b-ad7d-c0fe1f210000

Jan 12, 2019

Goose is running Feb!


Thought I'd share a post from the Galloping Goose org, on #5's upcoming schedule.  See the links & details on their site for details.


View this email in your browser

Drop what you're doing and hop in the Goose!

RGS Goose #5 Preliminary Schedule February 2019

This information is tentative and is subject to change. Schedule is final only when D&SNG posts the excursions on their website and begins to sell tickets. 

See Schedule below:
This information is tentative and is subject to change.  Schedule is final only when the Durango and Silverton Narrow Gauge Railroad (D&SNG) posts the excursions on their website and begins to sell tickets. (I suggest you look for the Cascade Runs and Photographer's Train under "Events".) We will post a direct link to ticketing on the Gallopinggoose5.org website and our Facebook page as soon as a specific link to D&SNG ticketing is available.
http://www.durangotrain.com/
Durango and Silverton Train:
Reservations: (970) 247-2733
General Information: (970) 247-2733
Toll Free: (877) 872-4607
Please consider the 2/22 & 2/23 excursions. These will be a less-expensive "non-railfan" friendly way to ride RGS Goose No. 5.  It is a unique way to enjoy winter railroading in the San Juan Mountains.  Lack of snow is of no concern this year..

We will update our website and Facebook page as the links become available to the D&SNG ticketing website.
Thank you.
Your Goose Crew.
Copyright © 2019 Galloping Goose Historical Society, All rights reserved.


Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.

Email Marketing Powered by Mailchimp

Nov 10, 2018

Quick update - more cars, more livestock moves

Quick update - still here, still working on bringing a new set of rolling stock to the layout. And also working through ideas to expand operations... thinking about livestock movements especially and how I can add more shipping locations to open up some more options.